An exploration in facilitating world-changing discovery.

PLACES

Ray Dolby Centre, Cambridge.

The client: University of Cambridge

The architect: Jestico+Whiles

The expertise: Acoustics, Audiovisual, EMI Design, Intelligent Buildings, Lighting Design, MEP, Operational Assets, Performance, Security, Sustainability (BREEAM), Vertical Transportation, Vibration

The challenge: To create a world-leading physics research facility that could accommodate science so sensitive that nearby speed bumps had to be removed to avoid vibration. The plant was physically separated from the main labs for the same reason, with the whole building heated and cooled via a huge ground source heat pump array using 150m deep boreholes.

The sector: Higher Education, Science & Research

Photos: Jestico+Whiles